Cabinets & countertops

Things have been moving and shaking at the OCR this week. The big news – the cabinets are painted and the countertops are installed!

In the kitchen, we went with Benjamin Moore Coventry Gray on the cabinets. After Wilson Custom Cabinets built and installed these beauties, the super-talented Kara Hamberlin painted them for us. The counters are allen + roth Frosted Wind – quartz with a marble-look. We couldn’t be more thrilled.  Obviously, there is some touch-up paint and trim work to be done. The floor will be a dark gray, slate-look ceramic tile with stainless steel appliances and a big vent hood in front of the west window (the one next to the back door). And we have a glass mosaic backsplash tile along the south wall. So the overall look of the kitchen is still going to change a lot…but it’s starting to come together.


The next not-so-big decision is cabinet hardware. We know we’re going to go with a brushed brass/bronze look and I think we’ve settled on bar pulls…maybe some knobs, too. We got some samples from Locks & Pulls, and we’ve spent days moving them around in different places in different light so we can make our final decision. And who knew there was so much to think about with cabinet hardware… Pulls? Knobs? Finish? Size? Style? Price?

We’re leaning toward a combination of the knob and pull on the bottom (from the Lewis Dolin Hardware round bar series). The top right pull (made by Liberty) is a little cheaper and matches the kitchen faucet a bit more closely…but the finish just is just a little more flat. The hex-shaped pull is for size only…we’re sticking with the round shape, I think.

This isn’t a big kitchen…it ended up only about 12 x 12. So we spent a lot of time wanting an island but angsting over whether we had room. Ultimately, we Tetris-ed it all in, and I think we ended up with a good design and flow. So far, it doesn’t feel crowded at all. Fingers cross that it doesn’t suddenly close in on us once the appliances are installed…

We also finished cabinets and countertops for the master vanity. We have some fun marble tile picked out for the floor and shower wall, so we kept the vanity pretty simple. The paint is Benjamin Moore White Dove, and the counter is a simple white quartz (allen+ roth Powderhorn). The fixtures in here will be chrome. The only issue we found is that the lights and sinks (and potential mirror placement) don’t *quite* work. If we kept it as-is, the mirrored medicine cabinets wouldn’t be centered over the sinks. So we’ll be taking out the middle sconce and going with one large mirror. It’s a small problem, but an annoying one. I blame the general contractor.*

I guess we could just call it…the Off Center Vanity?

Last but not least is the built-in bar under the stairs. We went with the same counters as we used in the kitchen and stained the cabinetry to try to at least come close to matching the woodwork and floors in that space, so it will at least have a quasi-built-in look. We’ll probably just do some old-school crystal knobs here.

So that’s where we are right now… the trim carpenter is working as we speak, which is totally bringing the space to life (I’ll be posting about that soon). Tile starts next week, followed immediately by plumbing (running water!). Then it’s refinishing the floors…and a final punch list…

We just might get to have a drink at that bar on the 4th of July!

Onward!

*The general contractor is Joe, who is awesome but not detail-oriented. 

Advertisements